Tokyo MOU
Statistical Data for Tokyo MOU Concentrated Inspection Campaign
29/02/12 Filed in: Port State Control
Tokyo MOU has published deficiency analysis for the CIC performed on Structural Safety and the International convention of Load Lines between 1st September 2011 and 30 November 2011. Read More...
Paris & Tokyo MOU joint CIC for structural safety & load lines items from 1 September to November 2011
20/06/11 Filed in: Port State Control
It has been decided in the 21st PSC meeting in Tokyo, for a joint Paris and Tokyo MOU concentrated inspection campaign (CIC) regarding Structural Safety & load line Systems. The CIC will be carried out from 1st September to 30 November 2011. Read More...
TOKYO MOU CIC on Harmful Substances
30/08/10 Filed in: Marpol | Port State Control
The Tokyo MOU and Indian Ocean MOU have announced a Concentrated Inspection Campaign CIC marine pollutants (harmful substances) carried in packaged form in accordance with Marpol Annex III, SOLAS VII and IMDG Code. The CIC is a three month campaign starting from 1 September 2010 up to 30 November 2010.
Read More...
Read More...