Paris & Tokyo MOU CIC on Propulsion and Auxiliary Machinery

Concentrated Inspection Campaign (CIC) on Propulsion and Auxiliary Machinery will be performed by Paris and Tokyo MOU member states from 1 September to 30 November 2013.

In this link the press release with associated checklist can be downloaded.

The propulsion and machinery installations will be verified in more detail forcompliance with the mentioned scope of the CIC during a regular Port StateControl inspection conducted under the regional ship selection criteria within theParis and Tokyo MoU regions.